Sharif Journal of Industrial Engineering & Management

Sharif Journal of Industrial Engineering & Management

Document Type: Research Note
Number of Articles: 109

Optimal assessment and analysis processes, Direct Rapid Tooling hierarchical analysis method (AHP)

Vol.23, No. 39, June 2007, Pages 75-85

E. khoei, Seyyed Hossein Mir-Hosseini, BdalRaza Symchy

A MULTI-OBJECTIVE TOUR ROUTING PROBLEM CONSIDERING THE TIME WINDOW AND TOURIST UTILITY

Volume 38, Issue 2, March 2023, Pages 99-108

10.24200/j65.2022.57006.2179

M. Shahbazi, R. Tavakkoli-Moghaddam, B. V‌a‌h‌e‌d‌i-N‌o‌u‌r‌i

Hub Location with the Backup Approach by Considering the Capacity Constraint in Critical Situations

Volume 41, Issue 1, September 2025, Pages 122-137

10.24200/j65.2024.62721.2365

Hasan Ziarati, Ali Shahandeh Nookabadi, Mohammad Reisi-Nafchi