1- Li, S., Jia, S., Tao, Y. and Lin, X., 2024. Gate appointment design in a container terminal: A robust optimization approach.
Transportation Research Part E: Logistics And Transportation Review,
184, pp.103495.doi:
https://doi.org/10.1016/j.tre.2024.103495
3- Azevedo, A.T., de Salles Neto, L.L., Chaves, A.A. and Moretti, A.C., 2018. Solving the 3D stowage planning problem integrated with the quay crane scheduling problem by representation by rules and genetic algorithm.
Applied Soft Computing,
65, pp.495–516.
https://doi.org/10.1016/j.asoc.2018.01.006
4- Bierwirth, C. and Meisel, F., 2015. A follow-up survey of berth allocation and quay crane scheduling problems in container terminals.
European Journal Of Operational Research,
244(3), pp.675–689.
https://doi.org/10.1016/j.ejor.2014.12.030
6- Peterkofsky, R.I. and Daganzo, C.F., 1990. A branch and bound solution method for the crane scheduling problem.
Transportation Research Part B: Methodological,
24(3), pp.159–172.
https://doi.org/10.1016/0191-2615(90)90014-P
8- Tavakkoli-Moghaddam, R., Makui, A., Salahi, S., Bazzazi, M. and Taheri, F., 2009. An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports.
Computers & Industrial Engineering,
56(1), pp.241–248.
https://doi.org/10.1016/j.cie.2008.05.011
10- Al-Dhaheri, N., Jebali, A. and Diabat, A., 2016. The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints.
Computers & Industrial Engineering,
94,pp.230–244.
https://doi.org/10.1016/j.cie.2016.01.011
11- Sun, D., Tang, L. and Baldacci, R., 2019. A Benders decomposition-based framework for solving quay crane scheduling problems.
European Journal Of Operational Research,
273(2), pp.504–515.
https://doi.org/10.1016/j.ejor.2018.08.009
12- Li, Y., Li, X., Zhang, C. and Wu, T., 2024. Decomposition algorithms for the robust unidirectional quay crane scheduling problems.
Computers & Operations Research,
167, pp.106670.
https://doi.org/10.1016/j.cor.2024.106670
13- Sun, D., Tang, L., Baldacci, R. and Chen, Z., 2024. A decomposition method for the group-based quay crane scheduling problem.
INFORMS Journal On Computing,
36,pp.543–570.
https://doi.org/10.1287/ijoc.2022.0298
16- Ng, W. and Mak, K., 2005. Yard crane scheduling in port container terminals. Applied Mathematical Modeling, 29, pp.263–276.
17- Li, W., Wu, Y., Petering, M.E., Goh, M. and De Souza, R., 2009. Discrete-time model and algorithms for container yard crane scheduling.
European Journal Of Operational Research,
198(1), pp.165–172.
https://doi.org/10.1016/j.ejor.2008.08.019
18- He, J., Chang, D., Mi, W. and Yan, W., 2010. A hybrid parallel genetic algorithm for yard crane scheduling.
Transportation Research Part E: Logistics And Transportation Review,
46(1), pp.136–155.
https://doi.org/10.1016/j.tre.2009.07.002
19- He, J., Huang, Y. and Yan, W., 2015. Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption.
Advanced Engineering Informatics,
29(1), pp.59–75.
https://doi.org/10.1016/j.aei.2014.09.003
20- He, J., Tan, C. and Zhang, Y., 2019. Yard crane scheduling problem in a container terminal considering risk caused by uncertainty.
Advanced Engineering Informatics,
39, pp.14–24.
https://doi.org/10.1016/j.aei.2018.11.004
21- Liang, C.-J., Chen, M., Gen, M. and Jo, J., 2014. A multi-objective genetic algorithm for yard crane scheduling problem with multiple work lines.
Journal Of Intelligent Manufacturing,
25, pp.1013–1024.
https://doi.org/10.1007/s10845-013-0792-4
22- Liu, W., Zhu, X., Wang, L., Yan, B. and Zhang, X., 2021. Optimization approach for yard crane scheduling problem with uncertain parameters in container terminals.
Journal Of Advanced Transportation,pp.1–15.
https://doi.org/10.1155/2021/5537114
23- Bazzazi, M., Safaei, N. and Javadian, N., 2009. A genetic algorithm to solve the storage space allocation problem in a container terminal.
Computers & Industrial Engineering,
56(1), pp.44–52.
https://doi.org/10.1016/j.cie.2008.03.012
24- Zhang, C., Liu, J., Wan, Y.-W., Murty, K.G. and Linn, R.J., 2003. Storage space allocation in container terminals.
Transportation Research Part B: Methodological,
37(10), pp.883–903.
https://doi.org/10.1016/S0191-2615(02)00089-9
26- Zhang, R.-Q., Wang, M. and Pan, X., 2019. New model of the storage location assignment problem considering demand correlation pattern.
Computers & Industrial Engineering,
129, pp.210–219.
https://doi.org/10.1016/j.cie.2019.01.027
28- Kaveshgar, N. and Huynh, N., 2015. Integrated quay crane and yard truck scheduling for unloading inbound containers.
International Journal Of Production Economics,
159, pp.168–177.
https://doi.org/10.1016/j.ijpe.2014.09.028
29- Tang, L., Zhao, J. and Liu, J., 2014. Modeling and solution of the joint quay crane and truck scheduling problem.
European Journal Of Operational Research,
236(3),pp.978–990.
https://doi.org/10.1016/j.ejor.2013.08.050
30-Lee, D.-H., Wang, H.Q. and Miao, L., 2008. Quay crane scheduling with non-interference constraints in port container terminals.
Transportation Research Part E: Logistics And Transportation Review,
44(1), pp.124–135.
https://doi.org/10.1016/j.tre.2006.08.001
31- Hop, D.C., Van Hop, N. and Anh, T.T.M., 2021. Adaptive particle swarm optimization for integrated quay crane and yard truck scheduling problem.
Computers & Industrial Engineering,
153, pp.107075.
https://doi.org/10.1016/j.cie.2020.107075
32- Zhen, L., Yu, S., Wang, S. and Sun, Z., Scheduling quay cranes and yard trucks for unloading operations in container ports. Annals Of Operations Research, pp.455–478.
https://doi.org/10.1007/s10479-016-2335-9
33- Skaf, A., Lamrous, S., Hammoudan, Z. and Manier, M.-A., 2021. Integrated quay crane and yard truck scheduling problem at the port of Tripoli-Lebanon.
Computers & Industrial Engineering,
159, pp.107448.
https://doi.org/10.1016/j.cie.2021.107448
34- Qin, T., Du, Y., Chen, J.H. and Sha, M., 2020. Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel.
European Journal Of Operational Research,
285(3),pp.884–901.
https://doi.org/10.1016/j.ejor.2020.02.021
35- Hsu, H.-P., Wang, C.-N., Fu, H.-P. and Dang, T.-T., 2021. Joint scheduling of yard crane, yard truck, and quay crane for container terminal considering vessel stowage plan: An integrated simulation-based optimization approach.
Mathematics,
9(18), pp.22–
https://doi.org/10.3390/math9182236
36- Hsu, H.-P., Chou, C.-C. and Wang, C.-N., 2022. Heuristic/metaheuristic-based simulation optimization approaches for integrated scheduling of yard crane, yard truck, and quay crane considering import and export containers.
IEEE Access,
10, pp.64650–64670.
1109/ACCESS.2022.3180752
37- Kizilay, D., Eliiyi, D.T. and Van Hentenryck, P., 2018. Constraint and mathematical programming models for integrated port container terminal operations. In: W.J. van Hoeve (ed.)
Integration of Constraint Programming, Artificial Intelligence, and Operations Research - 15th International Conference, CPAIOR 2018, Delft, The Netherlands, June 26–29, 2018, Proceedings, pp.344–360. Springer, Lecture Notes in Computer Science,
10848.
https://doi.org/10.1007/978-3-319-93031-2_25
38- Kizilay, D., Van Hentenryck, P. and Eliiyi, D.T., 2020. Constraint programming models for integrated container terminal operations.
European Journal Of Operational Research,
286(3), pp.945–962.
https://doi.org/10.1016/j.ejor.2020.04.025
39- Luo, J., Wu, Y. and Bergsten Mendes, A., 2016. Modelling of integrated vehicle scheduling and container storage problems in unloading process at an automated container terminal.
Computers & Industrial Engineering,
94, pp.32–44.
https://doi.org/10.1016/j.cie.2016.01.010