A
-
Abbasi, B.
QUANTIFYING RISK ANALYSIS USING DATABASE IN INDUSTRIAL INVESTMENT PROJECTS BY TOPSIS METHOD [Volume 28, Issue 1, 2012, Pages 121-127]
-
Albadvi, A. Albadvicorresponding
OFFERING A MODEL FOR CALCULATING CUSTOMER LIFE TIME VALUE (CLV) IN THE CONSTRUCTION ACHINERY INDUSTRY [Volume 28, Issue 1, 2012, Pages 19-26]
-
Alipour, M.
GENETIC AND MEMETIC ALGORITHMS FOR A FUZZY QUEUING MAXIMAL COVERING LOCATION-ALLOCATION MODEL FOR CONGESTED SYSTEMS WITH MULTIPLE DEMANDS [Volume 28, Issue 2, 2013, Pages 15-25]
-
Amin-Naseri, M.R.
A HYBRID INTELLIGENT SYSTEM BY COMBINING OPTIMIZED REGRESSION TREE AND SELF-ORGANIZING MAP FOR OPTIMAL CUSTOMER SEGMENTATION [Volume 28, Issue 2, 2013, Pages 43-54]
-
Amiri, M.
GENETIC AND MEMETIC ALGORITHMS FOR A FUZZY QUEUING MAXIMAL COVERING LOCATION-ALLOCATION MODEL FOR CONGESTED SYSTEMS WITH MULTIPLE DEMANDS [Volume 28, Issue 2, 2013, Pages 15-25]
-
Asadi-Bakloi, M.
DEVELOPMENT OF A STRUCTURAL MODEL FOR THE PERFORMANCE OF AIRLINE AGENCY SYSTEMS USING QUEUING THEORY [Volume 28, Issue 2, 2013, Pages 141-146]
-
Asadollahzadeh, M.
PERFORMANCE EVALUATION IN FRACTAL ORGANIZATIONS (CASE STUDY: GAS TURBO-COMPRESSOR STATIONS) [Volume 28, Issue 2, 2013, Pages 33-41]
-
Afzalabadi, M.
PRICE AND LEAD-TIME STUDY IN A DECENTRALIZED SUPPLY CHAIN UNDER COMPETITION [Volume 28, Issue 1, 2012, Pages 27-41]
-
Alikhani, E.
OFFERING A MODEL FOR CALCULATING CUSTOMER LIFE TIME VALUE (CLV) IN THE CONSTRUCTION ACHINERY INDUSTRY [Volume 28, Issue 1, 2012, Pages 19-26]
-
Amiri, M.
APPLICATION OF FUZZY MULTI ATTRIBUTE DECISION MAKING IN DETERMINING CRITICAL PATH USING TIME, COST, RISK AND QUALITY CRITERIA [Volume 28, Issue 1, 2012, Pages 11-17]
-
Asadi, J.
DECISIVE FACTORS IN ADOPTION OF INTERNET BANKING ؛(CASE STUDY: EGHTESAD NOVIN BANK) [Volume 28, Issue 1, 2012, Pages 87-98]
B
-
Bahreininejad, A.
A HYBRID INTELLIGENT SYSTEM BY COMBINING OPTIMIZED REGRESSION TREE AND SELF-ORGANIZING MAP FOR OPTIMAL CUSTOMER SEGMENTATION [Volume 28, Issue 2, 2013, Pages 43-54]
-
Baradaran Kazemzadeh, R.
INVESTIGATING INFLUENCES OF ORGANIZATIONAL LEARNING CAPABILITY ON INNOVATION [Volume 28, Issue 2, 2013, Pages 3-14]
-
Bashiri, M.
OPTIMIZING OF THE RESPONSE VARIABLE IN AN ORDINAL REGRESSION MODEL USING HEURISTIC AND META-HEURISTIC ALGORITHMS (A CASE STUDY: STUDENTS SATISFACTION EVALUATI [Volume 28, Issue 2, 2013, Pages 79-92]
D
-
Davarzani, H.
INVESTIGATING INFLUENCES OF ORGANIZATIONAL LEARNING CAPABILITY ON INNOVATION [Volume 28, Issue 2, 2013, Pages 3-14]
-
Deldar, M.
PRESENTING A NEW FUZZY MULTIOBJECTIVE MODEL FOR SUPPLIER SELECTION IN A SUPPLY CHAIN [Volume 28, Issue 2, 2013, Pages 55-65]
E
-
Eftekhar, L.
title{DYNAMIC MODELING OF MUNICIPAL SOLID WASTE MANAGEMENT SYSTEMS FOR METROPOLITAN CITY OF TEHRAN [Volume 28, Issue 2, 2013, Pages 67-77]
-
Eshraghniaye Jahromi, A.
PERFORMANCE EVALUATION IN FRACTAL ORGANIZATIONS (CASE STUDY: GAS TURBO-COMPRESSOR STATIONS) [Volume 28, Issue 2, 2013, Pages 33-41]
-
Emami, A.R.
SELECTION OF E-COMMERCE STRATEGY USING FUZZY ANALYTIC HIERARCHY PROCESS (CASE STUDY: ISFAHAN ALLOY STEEL CO. [Volume 28, Issue 1, 2012, Pages 53-62]
-
Eslami, M.R.
ANALYSIS OF THE POSITION OF THINK TANKS ON POLICY MAKING IN IRAN AND SEVERAL OTHER COUNTRIES [Volume 28, Issue 1, 2012, Pages 63-73]
F
-
Farsangi, M. H.
GENETIC AND MEMETIC ALGORITHMS FOR A FUZZY QUEUING MAXIMAL COVERING LOCATION-ALLOCATION MODEL FOR CONGESTED SYSTEMS WITH MULTIPLE DEMANDS [Volume 28, Issue 2, 2013, Pages 15-25]
-
Fatemi Ghomi, S.M.T.
DEVELOPMENT OF A STRUCTURAL MODEL FOR THE PERFORMANCE OF AIRLINE AGENCY SYSTEMS USING QUEUING THEORY [Volume 28, Issue 2, 2013, Pages 141-146]
-
Fathi, S.
SELECTION OF E-COMMERCE STRATEGY USING FUZZY ANALYTIC HIERARCHY PROCESS (CASE STUDY: ISFAHAN ALLOY STEEL CO. [Volume 28, Issue 1, 2012, Pages 53-62]
-
Fazli, S.Fazli
PROJECT SELECTION BASED ON OPTIMAL RESOURCE ALLOCATION USING ANP-GP APPROACH [Volume 28, Issue 1, 2012, Pages 99-111]
G
-
Ghaffari, M.M.
ANALYSIS OF THE POSITION OF THINK TANKS ON POLICY MAKING IN IRAN AND SEVERAL OTHER COUNTRIES [Volume 28, Issue 1, 2012, Pages 63-73]
-
Golozari, F.
APPLICATION OF FUZZY MULTI ATTRIBUTE DECISION MAKING IN DETERMINING CRITICAL PATH USING TIME, COST, RISK AND QUALITY CRITERIA [Volume 28, Issue 1, 2012, Pages 11-17]
H
-
Hoseinali Pour, M.
PRESENTING A CONCEPTUAL MODEL FOR IMPLEMENTATION OF EXPERT SYSTEMS FOR PLANNING CONSTRUCTION PROJECTS AS A TOOL FOR KNOWLEDGE MANAGEMENT IN A PROJECT EXECUTOR OR [Volume 28, Issue 2, 2013, Pages 93-102]
-
Hoseininasab, H.
APPLICATION OF RCM TO ENHANCE THE EFFICIENCY AND EFFECTIVENESS OF MAINTENANCE PROCESS (CASE STUDY: OIL AND GAS PRODUCTION, SOUTH ZAGROS COMPANY OF IRAN [Volume 28, Issue 2, 2013, Pages 133-140]
-
Hanafizadeh, P.
DECISIVE FACTORS IN ADOPTION OF INTERNET BANKING ؛(CASE STUDY: EGHTESAD NOVIN BANK) [Volume 28, Issue 1, 2012, Pages 87-98]
I
-
Iravani, M.
AN EMPIRICAL INVESTIGATION INTO RELATIONSHIP BETWEEN SUPPLY CHAIN VULNERABILITY DRIVERS AND DIFFERENT RISKS IN SUPPLY CHAIN OF IRAN AUTOMOTIVE INDUSTRY [Volume 28, Issue 1, 2012, Pages 75-85]
J
-
Jalilvand, M. R. Jalilvand
THE ROLE OF DEMOGRAPHIC CHARACTERISTICS IN PERCEIVED RISK AMONG INBOUND TOURISTS WHO VISIT IRAN [Volume 28, Issue 1, 2012, Pages 3-9]
K
-
Kamranrad, R.
OPTIMIZING OF THE RESPONSE VARIABLE IN AN ORDINAL REGRESSION MODEL USING HEURISTIC AND META-HEURISTIC ALGORITHMS (A CASE STUDY: STUDENTS SATISFACTION EVALUATI [Volume 28, Issue 2, 2013, Pages 79-92]
-
Karimi, H.
A NEURAL NETWORK APPROACH FOR SELECTING EVALUATION CRITERIA AND
APPLICATION OF DATA MINING IN DETERMINING SUPPLIERS CREDIT LEVELS
(CASE STUDY: ISOICO) [Volume 28, Issue 1, 2012, Pages 113-120]
-
Karimi, H.
OPTIMIZING OF THE RESPONSE VARIABLE IN AN ORDINAL REGRESSION MODEL USING HEURISTIC AND META-HEURISTIC ALGORITHMS (A CASE STUDY: STUDENTS SATISFACTION EVALUATI [Volume 28, Issue 2, 2013, Pages 79-92]
-
Kazemi, A.
PRESENTING A NEW FUZZY MULTIOBJECTIVE MODEL FOR SUPPLIER SELECTION IN A SUPPLY CHAIN [Volume 28, Issue 2, 2013, Pages 55-65]
-
Khedmatgozar, H.R.
DECISIVE FACTORS IN ADOPTION OF INTERNET BANKING ؛(CASE STUDY: EGHTESAD NOVIN BANK) [Volume 28, Issue 1, 2012, Pages 87-98]
-
Kimiagari, A.M.
A METHOD FOR DETERMINING REAL OPTION INPUT PARAMETERS IN THE IRANIAN PETROLEUM INDUSTRY: THE CASE OF SOUTH PARS GAS FIELD PROJECTS [Volume 28, Issue 1, 2012, Pages 129-137]
L
-
Lak, B.
RISK ANALYSIS OF TRAFFIC CONFINED CONTROL SYSTEM BASED ON RFID [Volume 28, Issue 2, 2013, Pages 113-130]
M
-
Mehdizadeh, E.
SOLVING TIME COST AND QUALITY TRADE OFF PROJECT PROBLEM USING MULTI OBJECTIVE STOCHASTIC PROGRAMMING [Volume 28, Issue 2, 2013, Pages 103-111]
-
Modarres, M.
A VND META-HEURISTIC FOR AIRCRAFT LANDING PROBLEMS [Volume 28, Issue 2, 2013, Pages 27-32]
-
Mohsenian, O.
SOLVING TIME COST AND QUALITY TRADE OFF PROJECT PROBLEM USING MULTI OBJECTIVE STOCHASTIC PROGRAMMING [Volume 28, Issue 2, 2013, Pages 103-111]
-
Madani, S.S.Madani
PROJECT SELECTION BASED ON OPTIMAL RESOURCE ALLOCATION USING ANP-GP APPROACH [Volume 28, Issue 1, 2012, Pages 99-111]
N
-
Nahavandi, N.
RISK ANALYSIS OF TRAFFIC CONFINED CONTROL SYSTEM BASED ON RFID [Volume 28, Issue 2, 2013, Pages 113-130]
-
Najafi, A. A.
QUANTIFYING RISK ANALYSIS USING DATABASE IN INDUSTRIAL INVESTMENT PROJECTS BY TOPSIS METHOD [Volume 28, Issue 1, 2012, Pages 121-127]
-
Nasiri, M. A.
A METHOD FOR DETERMINING REAL OPTION INPUT PARAMETERS IN THE IRANIAN PETROLEUM INDUSTRY: THE CASE OF SOUTH PARS GAS FIELD PROJECTS [Volume 28, Issue 1, 2012, Pages 129-137]
O
-
Owlia, M.S.
APPLICATION OF RCM TO ENHANCE THE EFFICIENCY AND EFFECTIVENESS OF MAINTENANCE PROCESS (CASE STUDY: OIL AND GAS PRODUCTION, SOUTH ZAGROS COMPANY OF IRAN [Volume 28, Issue 2, 2013, Pages 133-140]
P
-
Pakpour, M.
ANALYSIS OF THE POSITION OF THINK TANKS ON POLICY MAKING IN IRAN AND SEVERAL OTHER COUNTRIES [Volume 28, Issue 1, 2012, Pages 63-73]
R
-
Rashedi, H.
APPLICATION OF RCM TO ENHANCE THE EFFICIENCY AND EFFECTIVENESS OF MAINTENANCE PROCESS (CASE STUDY: OIL AND GAS PRODUCTION, SOUTH ZAGROS COMPANY OF IRAN [Volume 28, Issue 2, 2013, Pages 133-140]
-
Roudak, L.
PERFORMANCE EVALUATION IN FRACTAL ORGANIZATIONS (CASE STUDY: GAS TURBO-COMPRESSOR STATIONS) [Volume 28, Issue 2, 2013, Pages 33-41]
-
Ranjbarian, B.
THE ROLE OF DEMOGRAPHIC CHARACTERISTICS IN PERCEIVED RISK AMONG INBOUND TOURISTS WHO VISIT IRAN [Volume 28, Issue 1, 2012, Pages 3-9]
S
-
Sadri, R.
PRESENTING A CONCEPTUAL MODEL FOR IMPLEMENTATION OF EXPERT SYSTEMS FOR PLANNING CONSTRUCTION PROJECTS AS A TOOL FOR KNOWLEDGE MANAGEMENT IN A PROJECT EXECUTOR OR [Volume 28, Issue 2, 2013, Pages 93-102]
-
Salehipour, A.
A VND META-HEURISTIC FOR AIRCRAFT LANDING PROBLEMS [Volume 28, Issue 2, 2013, Pages 27-32]
-
Salmasi, N. Salmasi
A NEURAL NETWORK APPROACH FOR SELECTING EVALUATION CRITERIA AND
APPLICATION OF DATA MINING IN DETERMINING SUPPLIERS CREDIT LEVELS
(CASE STUDY: ISOICO) [Volume 28, Issue 1, 2012, Pages 113-120]
-
Sepehri, M.
title{
CRITICAL SUCCESS FACTORS IN OUTSOURCING OF CONSTRUCTION PROJECTS - CLIENTS
PERSPECTIVE (CASE: TEHRAN MUNICIPALITY) [Volume 28, Issue 1, 2012, Pages 43-51]
-
Soroush, A.R.
A HYBRID INTELLIGENT SYSTEM BY COMBINING OPTIMIZED REGRESSION TREE AND SELF-ORGANIZING MAP FOR OPTIMAL CUSTOMER SEGMENTATION [Volume 28, Issue 2, 2013, Pages 43-54]
-
Sanayei, A.
SELECTION OF E-COMMERCE STRATEGY USING FUZZY ANALYTIC HIERARCHY PROCESS (CASE STUDY: ISFAHAN ALLOY STEEL CO. [Volume 28, Issue 1, 2012, Pages 53-62]
-
Shakeri, M.
ANALYSIS OF THE POSITION OF THINK TANKS ON POLICY MAKING IN IRAN AND SEVERAL OTHER COUNTRIES [Volume 28, Issue 1, 2012, Pages 63-73]
-
Shavandi, H.
PRICE AND LEAD-TIME STUDY IN A DECENTRALIZED SUPPLY CHAIN UNDER COMPETITION [Volume 28, Issue 1, 2012, Pages 27-41]
-
Shirani, E.
ANALYSIS OF THE POSITION OF THINK TANKS ON POLICY MAKING IN IRAN AND SEVERAL OTHER COUNTRIES [Volume 28, Issue 1, 2012, Pages 63-73]
-
Sohrabpour, S.
ANALYSIS OF THE POSITION OF THINK TANKS ON POLICY MAKING IN IRAN AND SEVERAL OTHER COUNTRIES [Volume 28, Issue 1, 2012, Pages 63-73]
T
-
Taklif, A.
QUANTIFYING RISK ANALYSIS USING DATABASE IN INDUSTRIAL INVESTMENT PROJECTS BY TOPSIS METHOD [Volume 28, Issue 1, 2012, Pages 121-127]
Y
-
Yazdanpanah, A.A.
PRESENTING A CONCEPTUAL MODEL FOR IMPLEMENTATION OF EXPERT SYSTEMS FOR PLANNING CONSTRUCTION PROJECTS AS A TOOL FOR KNOWLEDGE MANAGEMENT IN A PROJECT EXECUTOR OR [Volume 28, Issue 2, 2013, Pages 93-102]
-
Yaghoubi, M.
ANALYSIS OF THE POSITION OF THINK TANKS ON POLICY MAKING IN IRAN AND SEVERAL OTHER COUNTRIES [Volume 28, Issue 1, 2012, Pages 63-73]
Z
-
Zaremehrjerdi, Y.
APPLICATION OF RCM TO ENHANCE THE EFFICIENCY AND EFFECTIVENESS OF MAINTENANCE PROCESS (CASE STUDY: OIL AND GAS PRODUCTION, SOUTH ZAGROS COMPANY OF IRAN [Volume 28, Issue 2, 2013, Pages 133-140]
-
Zegordi, S.H.
AN EMPIRICAL INVESTIGATION INTO RELATIONSHIP BETWEEN SUPPLY CHAIN VULNERABILITY DRIVERS AND DIFFERENT RISKS IN SUPPLY CHAIN OF IRAN AUTOMOTIVE INDUSTRY [Volume 28, Issue 1, 2012, Pages 75-85]
-
Zegordi, S.H.
INVESTIGATING INFLUENCES OF ORGANIZATIONAL LEARNING CAPABILITY ON INNOVATION [Volume 28, Issue 2, 2013, Pages 3-14]
Your query does not match with any item