Aghdasi, Mohammad PRESENTING A MODEL ON THE RESISTANCE TO CHANGE, BASED ON THEORY OF CONSTRAINTS:
A CASE STUDY OF ESFAHAN STEEL COMPANY (ESCO) [Volume 26, Issue 1, 2010, Pages 27-37]
Amiri, M. A MULTI-ITEM VENDOR-MANAGED INVENTORY WITH JOINT ORDERING CONSTRAINT [Volume 26, Issue 2, 2010, Pages 9-14]
B
Behzadi, S. AN EMPIRICAL INVESTIGATION ON THE EFFECT OF EXCHANGE RATES ON DIFFERENT GROUPS OF THE IRANIAN STOCK MARKET [Volume 26, Issue 2, 2010, Pages 89-97]
Beikverdi, M. OPTIMIZATION OF THE THRESHOLD FOR PREVENTIVE MAINTENANCE ACTIONS IN A CONDITION-BASED MAINTENANCE PROGRAM USING A DYNAMIC PROGRAMMING APPROACH [Volume 26, Issue 2, 2010, Pages 115-119]
Ghaffari, Ali A FEASIBILTY STUDY ON THE IMPLEMENTING OF A TOTAL PRODUCTIVE MAINTENANCE SYSTEM IN THE BANDAR-IMAM PETROCHEMICAL COMPANY [Volume 26, Issue 2, 2010, Pages 107-113]
J
Jafarian, M OPTIMIZATION OF THE THRESHOLD FOR PREVENTIVE MAINTENANCE ACTIONS IN A CONDITION-BASED MAINTENANCE PROGRAM USING A DYNAMIC PROGRAMMING APPROACH [Volume 26, Issue 2, 2010, Pages 115-119]
Nahavandi, Nasim MINIMIZATION FLOW TIME IN FLEXIBLE DYNAMIC JOB SHOP SCHEDULING PROBLEM WITH PARALLEL MACHINES [Volume 26, Issue 2, 2010, Pages 47-58]
R
Ranjbariyan, Bahram A COMPARISON OF CUSTOMER SATISFACTION CONSTRUCT WITH PERCEIVED OVERALL QUALITY: AN APPLICATION OF THE GREY SYSTEM THEORY [Volume 26, Issue 2, 2010, Pages 3-8]
S
Saghaei, Abbas DESIGNING A NEW MODEL FOR ASSESSING COUNTRIES ICT INFRASTRUCTURE READINESS [Volume 26, Issue 1, 2010, Pages 39-51]
Samarkand, Hamed TABU ALGORITHM FOR THE SINGLE ROW FACILITY LAYOUT PROBLEM [Volume 26, Issue 2, 2010, Pages 35-45]
Sepehri, Mehran EVALUATING SUCCESS FACTORS IN EPC PROJECTS: CASE STUDY; MAPNA POWER PLANT PROJECTS [Volume 26, Issue 2, 2010, Pages 23-33]
Shahanqy, Kamran OPTIMIZATION OF THE THRESHOLD FOR PREVENTIVE MAINTENANCE ACTIONS IN A CONDITION-BASED MAINTENANCE PROGRAM USING A DYNAMIC PROGRAMMING APPROACH [Volume 26, Issue 2, 2010, Pages 115-119]