A
-
Aghdasi, Mohammad
PRESENTING A MODEL ON THE RESISTANCE TO CHANGE, BASED ON THEORY OF CONSTRAINTS:
A CASE STUDY OF ESFAHAN STEEL COMPANY (ESCO) [Vol.26-1, Issue 1, 2010, Pages 27-37]
-
Amiri, M.
A MULTI-ITEM VENDOR-MANAGED INVENTORY WITH JOINT ORDERING CONSTRAINT [Vol.26-1, Issue 2, 2010, Pages 9-14]
B
-
Behzadi, S.
AN EMPIRICAL INVESTIGATION ON THE EFFECT OF EXCHANGE RATES ON DIFFERENT GROUPS OF THE IRANIAN STOCK MARKET [Vol.26-1, Issue 2, 2010, Pages 89-97]
-
Beikverdi, M.
OPTIMIZATION OF THE THRESHOLD FOR PREVENTIVE MAINTENANCE ACTIONS IN A CONDITION-BASED MAINTENANCE PROGRAM USING A DYNAMIC PROGRAMMING APPROACH [Vol.26-1, Issue 2, 2010, Pages 115-119]
E
-
Eshghi, Kurosh
ROBUST MODELS FOR INTERVAL COMPARISON MATRIX IN AHP [Vol.26-1, Issue 1, 2010, Pages 65-81]
F
-
Fatemi ghomi, S.M.taghi
AN EOQ MODEL FOR DETERIORATING ITEMS: GENETIC ALGORITHM APPROACH [Vol.26-1, Issue 1, 2010, Pages 83-90]
G
-
Ghaffari, Ali
A FEASIBILTY STUDY ON THE IMPLEMENTING OF A TOTAL PRODUCTIVE MAINTENANCE SYSTEM IN THE BANDAR-IMAM PETROCHEMICAL COMPANY [Vol.26-1, Issue 2, 2010, Pages 107-113]
J
-
Jafarian, M
OPTIMIZATION OF THE THRESHOLD FOR PREVENTIVE MAINTENANCE ACTIONS IN A CONDITION-BASED MAINTENANCE PROGRAM USING A DYNAMIC PROGRAMMING APPROACH [Vol.26-1, Issue 2, 2010, Pages 115-119]
-
Jenaminia, J.
AN EXECUTIVE MODEL FOR OPTIMAL ACHIEVEMENT OF ORGANIZATION VISION ,USING GOAL PROGRAMMING [Vol.26-1, Issue 1, 2010, Pages 147-151]
-
Jokar, M.Reza
JOINT ECONOMIC LOT SIZING MODELS IN MULTI-STAGE SUPPLY CHAINS: REVIEW AND DIRECTIONS FOR FUTURE RESEARCH [Vol.26-1, Issue 1, 2010, Pages 127-136]
K
-
Kiyanfar, Fereydon
APPLICATION OF TOTAL WASTE ELIMINATION (TWE) IN JAHAN AFROOZ COMPANY, BASED ON LEAN MANAGEMENT [Vol.26-1, Issue 1, 2010, Pages 11-25]
M
-
Mansour, Saeed
ANALYSIS AND CLASSIFICATION OF KEY FAILURE FACTORS OF BPR PROJECTS [Vol.26-1, Issue 1, 2010, Pages 55-63]
-
Martial, J.
SOLVING THE DYNAMIC VEHICLE ROUTING PROBLEM WITH ANTNET ALGORITHM [Vol.26-1, Issue 2, 2010, Pages 65-70]
-
Mhynyzadh, S.
MARKET ORIENTATION MEASUREMENT FOR CERAMIC TILE INDUSTRIES OF ISFAHAN AND YAZD PROVINCES [Vol.26-1, Issue 2, 2010, Pages 15-19]
-
Modares, Mohammad
APPLICATION OF CIRCULAR COLORING AND ANT COLONY ALGORITHM TO CYCLIC OPENSHOP
SCHEDULING PROBLEMS [Vol.26-1, Issue 1, 2010, Pages 3-10]
-
Modarres, Mohammad
DEVELOPMENT OF AN ALGORITHM FOR THE STABILITY REGION BY CHANGING THE REFERENCE SET IN DEA [Vol.26-1, Issue 2, 2010, Pages 59-64]
-
Mohammd fam, Iraj
THE INTRODUCTION OF A FUZZY EXPERT SYSTEM, BASED ON A BALANCED SCORECARD, FOR
MEASURING THE EFFECT OF HEALTH, SAFETY AND ENVIRONMENT MANAGEMENT SYSTEMS ON
ORGANIZA [Vol.26-1, Issue 1, 2010, Pages 137-145]
N
-
Nahavandi, Nasim
MINIMIZATION FLOW TIME IN FLEXIBLE DYNAMIC JOB SHOP SCHEDULING PROBLEM WITH PARALLEL MACHINES [Vol.26-1, Issue 2, 2010, Pages 47-58]
R
-
Ranjbariyan, Bahram
A COMPARISON OF CUSTOMER SATISFACTION CONSTRUCT WITH PERCEIVED OVERALL QUALITY: AN APPLICATION OF THE GREY SYSTEM THEORY [Vol.26-1, Issue 2, 2010, Pages 3-8]
S
-
Saghaei, Abbas
DESIGNING A NEW MODEL FOR ASSESSING COUNTRIES ICT INFRASTRUCTURE READINESS [Vol.26-1, Issue 1, 2010, Pages 39-51]
-
Samarkand, Hamed
TABU ALGORITHM FOR THE SINGLE ROW FACILITY LAYOUT PROBLEM [Vol.26-1, Issue 2, 2010, Pages 35-45]
-
Sepehri, Mehran
EVALUATING SUCCESS FACTORS IN EPC PROJECTS: CASE STUDY; MAPNA POWER PLANT PROJECTS [Vol.26-1, Issue 2, 2010, Pages 23-33]
-
Shahanqy, Kamran
OPTIMIZATION OF THE THRESHOLD FOR PREVENTIVE MAINTENANCE ACTIONS IN A CONDITION-BASED MAINTENANCE PROGRAM USING A DYNAMIC PROGRAMMING APPROACH [Vol.26-1, Issue 2, 2010, Pages 115-119]
-
Sohrabi, Babak
A MODEL FOR CRM MATURITY ASSESSMENT (CASE STUDY: IRANIAN IT FIRM) [Vol.26-1, Issue 1, 2010, Pages 117-124]
Z
-
Zegordi, S.Hesam
FLEXIBLE JOB SHOP SCHEDULING PROBLEM; CONSIDERING MAINTENANCE CONSTRAINT [Vol.26-1, Issue 1, 2010, Pages 101-115]
Your query does not match with any item