Sharif Journal of Industrial Engineering & Management
Home
Browse
Current Issue
By Issue
By Author
By Subject
Author Index
Keyword Index
Journal Info
About Journal
Aims and Scope
Editorial Board
Publication Ethics
Indexing and Abstracting
Related Links
FAQ
Peer Review Process
Journal Metrics
News
Guide for Authors
Submit Manuscript
Reviewers
Contact Us
Login
Login
Register
Persian
Keyword Index
All Volumes
Volume 41
Volume 40
Volume 39
Volume 38
Volume 37
Volume 36
Volume 35
Volume 34
Volume 33
Volume 32
Volume 31
Volume 30
Volume 29
Volume 28
Volume 27
Volume 26
Vol.25
Vol.25
Vol.23
Vol.22
Vol.21
Vol.20
Vol.19
Vol. 18
Vol.17
Vol.16
Vol.15
Vol.14
Vol.13
Vol.12
Vol. 11
Volume 10
vol. 9
vol. 8
ALL
A
1
B
0
C
1
D
0
E
2
F
0
G
0
H
1
I
0
J
0
K
0
L
0
M
2
N
0
O
0
P
5
Q
1
R
0
S
0
T
0
U
0
V
0
W
0
X
0
Y
0
Z
0
A
Analytic hierarchy process
GENERATING AN INCORPORATED BALANCED SCORECARD (BSC) AND FUZZY ANALYSIS NETWORK PROCESS MODEL (FANP) (CASE STUDY: ISFAHAN MUNICIPALITY)
[Volume 27, Issue 1, 2011, Pages 65-73]
C
Condition-based maintenance
OPTIMAL INSPECTION INTERVALS AND CONTROL LIMITS IN CONDITION-BASED MAINTENANCE
[Volume 27, Issue 1, 2011, Pages 103-111]
E
E-Readiness
DESIGN OF AN E-LEARNING READINESS ASSESSMENT MODEL FOR IRANIAN UNIVERSITIES
[Volume 27, Issue 1, 2011, Pages 21-30]
Evaluation
EVALUATION OF THE COMPETENCY OF INDUSTRIAL EQUIPMENT MANUFACTURERS IN THE OIL INDUSTRY, USING PROMSORT
[Volume 27, Issue 1, 2011, Pages 39-45]
H
Hub location problem
A MULTI-OBJECTIVE P-HUB MEDIAN PROBLEM CONSIDERING QUEUE UNDER FUZZY ENVIRONMENT
[Volume 27, Issue 1, 2011, Pages 11-19]
M
Make to stock
MAKE TO ORDER, MAKE TO STOCK, SELECTION MODEL IN A COMBINED SYSTEM
[Volume 27, Issue 1, 2011, Pages 47-53]
Modeling
PREDICTING THE PERFORMANCE OF A PRODUCTION PROCESS BASED ON LOGISTIC REGRESSION AND ARTIFICIAL NEURAL NETWORKS (CASE STUDY: TILE SPRAY DRYING
[Volume 27, Issue 1, 2011, Pages 31-38]
P
Portfolio optimization
ROBUST OPTIMIZATION OF A PORTFOLIO WHICH INCLUDES OPTIONS
[Volume 27, Issue 1, 2011, Pages 93-102]
Portfolio selection
PARTICLE SWARM OPTIMIZATION FOR EXTENDED PORTFOLIO SELECTION PROBLEM
[Volume 27, Issue 1, 2011, Pages 113-125]
Project management
THE REALITY OF A PROJECT MANAGEMENT OFFICE FOR CONSTRUCTION ORGANIZATION IN THE OIL, GAS, AND PETROCHEMICAL INDUSTRY OF IRAN
[Volume 27, Issue 1, 2011, Pages 55-63]
PROMETHEE
EVALUATION OF THE COMPETENCY OF INDUSTRIAL EQUIPMENT MANUFACTURERS IN THE OIL INDUSTRY, USING PROMSORT
[Volume 27, Issue 1, 2011, Pages 39-45]
PROMSORT
EVALUATION OF THE COMPETENCY OF INDUSTRIAL EQUIPMENT MANUFACTURERS IN THE OIL INDUSTRY, USING PROMSORT
[Volume 27, Issue 1, 2011, Pages 39-45]
Q
Quality control
APPLICATION OF RESPONSE SURFACE METHODOLOGY AND FUZZY REGRESSION METHOD TO DETERMINE OPTIMUM AMOUNT OF EFFECTIVE FACTORS IN VEHICLE BRAKE DRUM ASSEMBLING PRO?
[Volume 27, Issue 1, 2011, Pages 133-143]