Document Type : Article
Authors
1 Dept. of Industrial Engineerng Alzahra University
2 Dept. of Industrial Engineerng Bu-Ali Sina University
Abstract
Keywords
Fattahi, P. , Bagheri Rad, N. and Daneshamooz, F. (2019). SOLVING FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH AN ASSEMBLY STAGE AND SEQUENCE DEPENDENT SETUP TIME. Sharif Journal of Industrial Engineering & Management, 34.1(2.2), 119-131. doi: 10.24200/j65.2018.20092
Fattahi, P. , , Bagheri Rad, N. , and Daneshamooz, F. . "SOLVING FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH AN ASSEMBLY STAGE AND SEQUENCE DEPENDENT SETUP TIME", Sharif Journal of Industrial Engineering & Management, 34.1, 2.2, 2019, 119-131. doi: 10.24200/j65.2018.20092
Fattahi, P., Bagheri Rad, N., Daneshamooz, F. (2019). 'SOLVING FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH AN ASSEMBLY STAGE AND SEQUENCE DEPENDENT SETUP TIME', Sharif Journal of Industrial Engineering & Management, 34.1(2.2), pp. 119-131. doi: 10.24200/j65.2018.20092
P. Fattahi , N. Bagheri Rad and F. Daneshamooz, "SOLVING FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH AN ASSEMBLY STAGE AND SEQUENCE DEPENDENT SETUP TIME," Sharif Journal of Industrial Engineering & Management, 34.1 2.2 (2019): 119-131, doi: 10.24200/j65.2018.20092
Fattahi, P., Bagheri Rad, N., Daneshamooz, F. SOLVING FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH AN ASSEMBLY STAGE AND SEQUENCE DEPENDENT SETUP TIME. Sharif Journal of Industrial Engineering & Management, 2019; 34.1(2.2): 119-131. doi: 10.24200/j65.2018.20092