The increasing growth of container transportation has led container terminals, as the primary hubs of cargo transfer in the global supply chain, to continuously improve their efficiency and operations to be successful in this competitive industry. Various problems have arisen in the maritime logistics field owing to the division of container terminals into two sections, quayside and yardside. This study examines the integration of problems on the quayside and the yardside. Specifically, it simultaneously investigates the quay crane scheduling problem as a quayside problem, along with the yard truck scheduling problem, yard crane scheduling problem, and storage space allocation problem as part of the yardside problems. A new integer linear programming model has been presented for the integrated problem of equipment handling scheduling and storage location allocation. This problem aims to minimize the time required to complete containers and operational costs. These operational costs include unloading containers from vessels using a quay crane, moving them to the yard via yard trucks, and loading them using a yard crane. The integrated problem is classified under the category of NP-hard problems in terms of computational complexity. Furthermore, they were introduced and added to the model according to the problem structure to expedite the resolution of constraints under valid inequalities. To validate the model's accuracy, instances were designed, implemented in GAMS software, and executed using the CPLEX solver. The computational results demonstrate that the incorporation of valid inequalities across all instances reduces computational time. Furthermore, in instances involving larger problems, where the mathematical model was unable to determine the optimal solution within a reasonable time, the addition of valid inequalities yielded solutions with an average gap of 1.78% from the lower bound. By contrast, the proposed model without the inclusion of valid inequalities achieved solutions with a gap of 3.08% from the lower bound.
Li, S., Jia, S., Tao, Y. and Lin, X., 2024. Gate appointment design in a container terminal: A robust optimization approach. Transportation Research Part E: Logistics And Transportation Review, 184, pp.103495.
Azevedo, A.T., de Salles Neto, L.L., Chaves, A.A. and Moretti, A.C., 2018. Solving the 3D stowage planning problem integrated with the quay crane scheduling problem by representation by rules and genetic algorithm. Applied Soft Computing, 65, pp.495–516. https://doi.org/10.1016/j.asoc.2018.01.006
Bierwirth, C. and Meisel, F., 2015. A follow-up survey of berth allocation and quay crane scheduling problems in container terminals. European Journal Of Operational Research, 244(3), pp.675–689. https://doi.org/10.1016/j.ejor.2014.12.030
Peterkofsky, R.I. and Daganzo, C.F., 1990. A branch and bound solution method for the crane scheduling problem. Transportation Research Part B: Methodological, 24(3), pp.159–172. https://doi.org/10.1016/0191-2615(90)90014-P
Kim, K.H. and Park, Y.-M., 2004. A crane scheduling method for port container terminals. European Journal Of Operational Research, 156(3), pp.752–768.
Tavakkoli-Moghaddam, R., Makui, A., Salahi, S., Bazzazi, M. and Taheri, F., 2009. An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports. Computers & Industrial Engineering, 56(1), pp.241–248. https://doi.org/10.1016/j.cie.2008.05.011
Abou Kasm, O. and Diabat, A., 2020. Next-generation quay crane scheduling. Transportation Research Part C: Emerging Technologies, 114, pp.694–715. https://doi.org/10.1016/j.trc.2020.02.015
Al-Dhaheri, N., Jebali, A. and Diabat, A., 2016. The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints. Computers & Industrial Engineering, 94,pp.230–244. https://doi.org/10.1016/j.cie.2016.01.011
Sun, D., Tang, L. and Baldacci, R., 2019. A Benders decomposition-based framework for solving quay crane scheduling problems. European Journal Of Operational Research, 273(2), pp.504–515. https://doi.org/10.1016/j.ejor.2018.08.009
Li, Y., Li, X., Zhang, C. and Wu, T., 2024. Decomposition algorithms for the robust unidirectional quay crane scheduling problems. Computers & Operations Research, 167, pp.106670. https://doi.org/10.1016/j.cor.2024.106670
Sun, D., Tang, L., Baldacci, R. and Chen, Z., 2024. A decomposition method for the group-based quay crane scheduling problem. INFORMS Journal On Computing,36,pp.543–570. https://doi.org/10.1287/ijoc.2022.0298
Ng, W., 2005. Crane scheduling in container yards with inter-crane interference. European Journal Of Operational Research, 164(1), pp.64–78. https://doi.org/10.1016/j.ejor.2003.11.025
Ng, W., 2005. Crane scheduling in container yards with inter-crane interference. European Journal Of Operational Research, 164(1), pp.64–78. https://doi.org/10.1016/j.ejor.2003.11.025
Ng, W. and Mak, K., 2005. Yard crane scheduling in port container terminals. Applied Mathematical Modeling, 29, pp.263–276.
Li, W., Wu, Y., Petering, M.E., Goh, M. and De Souza, R., 2009. Discrete-time model and algorithms for container yard crane scheduling. European Journal Of Operational Research, 198(1), pp.165–172. https://doi.org/10.1016/j.ejor.2008.08.019
He, J., Chang, D., Mi, W. and Yan, W., 2010. A hybrid parallel genetic algorithm for yard crane scheduling. Transportation Research Part E: Logistics And Transportation Review, 46(1), pp.136–155. https://doi.org/10.1016/j.tre.2009.07.002
He, J., Huang, Y. and Yan, W., 2015. Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption. Advanced Engineering Informatics, 29(1), pp.59–75. https://doi.org/10.1016/j.aei.2014.09.003
He, J., Tan, C. and Zhang, Y., 2019. Yard crane scheduling problem in a container terminal considering risk caused by uncertainty. Advanced Engineering Informatics, 39, pp.14–24. https://doi.org/10.1016/j.aei.2018.11.004
Liang, C.-J., Chen, M., Gen, M. and Jo, J., 2014. A multi-objective genetic algorithm for yard crane scheduling problem with multiple work lines. Journal Of Intelligent Manufacturing, 25, pp.1013–1024. https://doi.org/10.1007/s10845-013-0792-4
Liu, W., Zhu, X., Wang, L., Yan, B. and Zhang, X., 2021. Optimization approach for yard crane scheduling problem with uncertain parameters in container terminals. Journal Of Advanced Transportation,pp.1–15. https://doi.org/10.1155/2021/5537114
Bazzazi, M., Safaei, N. and Javadian, N., 2009. A genetic algorithm to solve the storage space allocation problem in a container terminal. Computers & Industrial Engineering, 56(1), pp.44–52. https://doi.org/10.1016/j.cie.2008.03.012
Zhang, C., Liu, J., Wan, Y.-W., Murty, K.G. and Linn, R.J., 2003. Storage space allocation in container terminals. Transportation Research Part B: Methodological, 37(10), pp.883–903. https://doi.org/10.1016/S0191-2615(02)00089-9
Lin, D.- and Chiang, C.-W., 2017. The storage space allocation problem at a container terminal. Maritime Policy & Management, 44(6), pp.685–704. https://doi.org/10.1080/03088839.2017.1335897
Zhang, R.-Q., Wang, M. and Pan, X., 2019. New model of the storage location assignment problem considering demand correlation pattern. Computers & Industrial Engineering, 129, pp.210–219. https://doi.org/10.1016/j.cie.2019.01.027
Cao, J., Shi, Q. and Lee, D.-H., 2010. Integrated quay crane and yard truck schedule problem in container terminals. Tsinghua Science & Technology,15(4),pp.467–474. https://doi.org/10.1016/S1007-0214(10)70089-4
Kaveshgar, N. and Huynh, N., 2015. Integrated quay crane and yard truck scheduling for unloading inbound containers. International Journal Of Production Economics, 159, pp.168–177. https://doi.org/10.1016/j.ijpe.2014.09.028
Tang, L., Zhao, J. and Liu, J., 2014. Modeling and solution of the joint quay crane and truck scheduling problem. European Journal Of Operational Research,236(3),pp.978–990. https://doi.org/10.1016/j.ejor.2013.08.050
Lee, D.-H., Wang, H.Q. and Miao, L., 2008. Quay crane scheduling with non-interference constraints in port container terminals. Transportation Research Part E: Logistics And Transportation Review, 44(1), pp.124–135. https://doi.org/10.1016/j.tre.2006.08.001
Hop, D.C., Van Hop, N. and Anh, T.T.M., 2021. Adaptive particle swarm optimization for integrated quay crane and yard truck scheduling problem. Computers & Industrial Engineering, 153, pp.107075. https://doi.org/10.1016/j.cie.2020.107075
Zhen, L., Yu, S., Wang, S. and Sun, Z., Scheduling quay cranes and yard trucks for unloading operations in container ports. Annals Of Operations Research, pp.455–478. https://doi.org/10.1007/s10479-016-2335-9
Skaf, A., Lamrous, S., Hammoudan, Z. and Manier, M.-A., 2021. Integrated quay crane and yard truck scheduling problem at the port of Tripoli-Lebanon. Computers & Industrial Engineering, 159, pp.107448. https://doi.org/10.1016/j.cie.2021.107448
Qin, T., Du, Y., Chen, J.H. and Sha, M., 2020. Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel. European Journal Of Operational Research,285(3),pp.884–901. https://doi.org/10.1016/j.ejor.2020.02.021
Hsu, H.-P., Wang, C.-N., Fu, H.-P. and Dang, T.-T., 2021. Joint scheduling of yard crane, yard truck, and quay crane for container terminal considering vessel stowage plan: An integrated simulation-based optimization approach. Mathematics, 9(18), pp.22–https://doi.org/10.3390/math9182236
Hsu, H.-P., Chou, C.-C. and Wang, C.-N., 2022. Heuristic/metaheuristic-based simulation optimization approaches for integrated scheduling of yard crane, yard truck, and quay crane considering import and export containers. IEEE Access, 10, pp.64650–64670.1109/ACCESS.2022.3180752
Kizilay, D., Eliiyi, D.T. and Van Hentenryck, P., 2018. Constraint and mathematical programming models for integrated port container terminal operations. In: W.J. van Hoeve (ed.) Integration of Constraint Programming, Artificial Intelligence, and Operations Research - 15th International Conference, CPAIOR 2018, Delft, The Netherlands, June 26–29, 2018, Proceedings, pp.344–360. Springer, Lecture Notes in Computer Science, 10848. https://doi.org/10.1007/978-3-319-93031-2_25
Kizilay, D., Van Hentenryck, P. and Eliiyi, D.T., 2020. Constraint programming models for integrated container terminal operations. European Journal Of Operational Research, 286(3), pp.945–962. https://doi.org/10.1016/j.ejor.2020.04.025
Luo, J., Wu, Y. and Bergsten Mendes, A., 2016. Modelling of integrated vehicle scheduling and container storage problems in unloading process at an automated container terminal. Computers & Industrial Engineering, 94, pp.32–44. https://doi.org/10.1016/j.cie.2016.01.010
Fani Sadrabadi, Z. and Alinaghian, M. (2026). An Integrated Problem of Handling Equipment Scheduling and Storage Space Allocation for Inbound Containers at Container Terminal. Sharif Journal of Industrial Engineering & Management, 41(2), 31-43. doi: 10.24200/j65.2025.65278.2413
MLA
Fani Sadrabadi, Z. , and Alinaghian, M. . "An Integrated Problem of Handling Equipment Scheduling and Storage Space Allocation for Inbound Containers at Container Terminal", Sharif Journal of Industrial Engineering & Management, 41, 2, 2026, 31-43. doi: 10.24200/j65.2025.65278.2413
HARVARD
Fani Sadrabadi, Z., Alinaghian, M. (2026). 'An Integrated Problem of Handling Equipment Scheduling and Storage Space Allocation for Inbound Containers at Container Terminal', Sharif Journal of Industrial Engineering & Management, 41(2), pp. 31-43. doi: 10.24200/j65.2025.65278.2413
CHICAGO
Z. Fani Sadrabadi and M. Alinaghian, "An Integrated Problem of Handling Equipment Scheduling and Storage Space Allocation for Inbound Containers at Container Terminal," Sharif Journal of Industrial Engineering & Management, 41 2 (2026): 31-43, doi: 10.24200/j65.2025.65278.2413
VANCOUVER
Fani Sadrabadi, Z., Alinaghian, M. An Integrated Problem of Handling Equipment Scheduling and Storage Space Allocation for Inbound Containers at Container Terminal. Sharif Journal of Industrial Engineering & Management, 2026; 41(2): 31-43. doi: 10.24200/j65.2025.65278.2413