Document Type : Article
Authors
Dept. of Industrial and Systems Engineering-\n Isfahan University of Technology
Abstract
Keywords
Reisi-Nafchi, M., & Moslehi, G. (2014). CONSTRAINED OPTIMIZATION PROBLEM OF TWO-AGENT ORDER ACCEPTANCE AND SCHEDULING TO MAXIMIZE TOTAL PROFIT. Sharif Journal of Industrial Engineering & Management, VOL 30-1(2), 87-99.
M. Reisi-Nafchi; Gh. Moslehi. "CONSTRAINED OPTIMIZATION PROBLEM OF TWO-AGENT ORDER ACCEPTANCE AND SCHEDULING TO MAXIMIZE TOTAL PROFIT". Sharif Journal of Industrial Engineering & Management, VOL 30-1, 2, 2014, 87-99.
Reisi-Nafchi, M., Moslehi, G. (2014). 'CONSTRAINED OPTIMIZATION PROBLEM OF TWO-AGENT ORDER ACCEPTANCE AND SCHEDULING TO MAXIMIZE TOTAL PROFIT', Sharif Journal of Industrial Engineering & Management, VOL 30-1(2), pp. 87-99.
Reisi-Nafchi, M., Moslehi, G. CONSTRAINED OPTIMIZATION PROBLEM OF TWO-AGENT ORDER ACCEPTANCE AND SCHEDULING TO MAXIMIZE TOTAL PROFIT. Sharif Journal of Industrial Engineering & Management, 2014; VOL 30-1(2): 87-99.