Document Type : Article
Authors
Dept. of Industrial and Systems Engineering-\n Isfahan University of Technology
Abstract
Keywords
Reisi-Nafchi, M. and Moslehi, G. (2014). CONSTRAINED OPTIMIZATION PROBLEM OF TWO-AGENT ORDER ACCEPTANCE AND SCHEDULING TO MAXIMIZE TOTAL PROFIT. Sharif Journal of Industrial Engineering & Management, VOL 30-1(2), 87-99.
Reisi-Nafchi, M. , and Moslehi, G. . "CONSTRAINED OPTIMIZATION PROBLEM OF TWO-AGENT ORDER ACCEPTANCE AND SCHEDULING TO MAXIMIZE TOTAL PROFIT", Sharif Journal of Industrial Engineering & Management, VOL 30-1, 2, 2014, 87-99.
Reisi-Nafchi, M., Moslehi, G. (2014). 'CONSTRAINED OPTIMIZATION PROBLEM OF TWO-AGENT ORDER ACCEPTANCE AND SCHEDULING TO MAXIMIZE TOTAL PROFIT', Sharif Journal of Industrial Engineering & Management, VOL 30-1(2), pp. 87-99.
M. Reisi-Nafchi and G. Moslehi, "CONSTRAINED OPTIMIZATION PROBLEM OF TWO-AGENT ORDER ACCEPTANCE AND SCHEDULING TO MAXIMIZE TOTAL PROFIT," Sharif Journal of Industrial Engineering & Management, VOL 30-1 2 (2014): 87-99,
Reisi-Nafchi, M., Moslehi, G. CONSTRAINED OPTIMIZATION PROBLEM OF TWO-AGENT ORDER ACCEPTANCE AND SCHEDULING TO MAXIMIZE TOTAL PROFIT. Sharif Journal of Industrial Engineering & Management, 2014; VOL 30-1(2): 87-99.