Document Type : Article
Authors
1 Faculty of Engineering\ Bu-Ali Sina University
2 Dept.of Industrial Engineering-Alzahra University
Abstract
Keywords
Fattahi, P. and Parand, H. (2016). A MODEL AND CONSTRUCTIVE HEURISTIC APPROACH FOR MULTI-PRODUCT MULTI-PERIOD INVENTORY ROUTING PROBLEM WITH BACKLOGGING AND TIME WINDOW. Sharif Journal of Industrial Engineering & Management, 32.1(1.1), 99-111.
Fattahi, P. , and Parand, H. . "A MODEL AND CONSTRUCTIVE HEURISTIC APPROACH FOR MULTI-PRODUCT MULTI-PERIOD INVENTORY ROUTING PROBLEM WITH BACKLOGGING AND TIME WINDOW", Sharif Journal of Industrial Engineering & Management, 32.1, 1.1, 2016, 99-111.
Fattahi, P., Parand, H. (2016). 'A MODEL AND CONSTRUCTIVE HEURISTIC APPROACH FOR MULTI-PRODUCT MULTI-PERIOD INVENTORY ROUTING PROBLEM WITH BACKLOGGING AND TIME WINDOW', Sharif Journal of Industrial Engineering & Management, 32.1(1.1), pp. 99-111.
P. Fattahi and H. Parand, "A MODEL AND CONSTRUCTIVE HEURISTIC APPROACH FOR MULTI-PRODUCT MULTI-PERIOD INVENTORY ROUTING PROBLEM WITH BACKLOGGING AND TIME WINDOW," Sharif Journal of Industrial Engineering & Management, 32.1 1.1 (2016): 99-111,
Fattahi, P., Parand, H. A MODEL AND CONSTRUCTIVE HEURISTIC APPROACH FOR MULTI-PRODUCT MULTI-PERIOD INVENTORY ROUTING PROBLEM WITH BACKLOGGING AND TIME WINDOW. Sharif Journal of Industrial Engineering & Management, 2016; 32.1(1.1): 99-111.