A
-
Abbasnezhad sahnehsaraee, R.
SUBMITTING A PATTERN FOR THE EVALUATION OF PERFORMANCE OF THERAPEUTIC CENTERS
WITH JOB BY BSC AND COMBINING IT WITH THE FANP METHOD (CASE STUDY: IMAM SAJJAD [32.1, 1.1, 2016, Pages 139-146]
-
Abdi, F.
TWO METAHEURISTIC APPROACHES FOR DISCRETE TIME-COST-QUALITY TRADEOFF PROBLEM WITH GENERALIZED PRECEDENCE CONSTRAINTS [32.1, 1.2, 2016, Pages 35-46]
-
Afrazeh, A.
A MODEL FOR MEASURING THE GAP IN ORGANIZATIONAL RESOURCES INVESTMENT, EMPIRICAL STUDY IN IRAN AUTOMOTIVE INDUSTRY [32.1, 2.2, 2017, Pages 121-130]
-
Afshar Nadjafi, B.
[32.1, 2.2, 2017, Pages 113-120]
-
Aghaei, M.A.
COMPANY PERFORMANCE EVALUATION USING FINANCIAL RATIOS: AN APPLICATION OF
BOOTSTRAPPED DATA ENVELOPMENT ANALYSIS APPROACH [32.1, 2.1, 2017, Pages 101-109]
-
Aghaie, A.
LINEAR PROGRAMMING MODELS FOR LATEST OCCURRENCE TIMES IN PROJECT NETWORKS WITH IMPRECISE DURATIONS [32.1, 1.2, 2016, Pages 3-11]
-
Aghaie, A.
MULTI-BOUND ROBUST MODEL OF FACILITY LOCATION PROBLEM TO DEAL WITH HISTOGRAM-BASE UNCERTAINTY [32.1, 2.1, 2017, Pages 111-117]
-
Ahadmotlaghi, E.
THE ROLE OF ERP IN THE ENTERPRISE PROCESS IMPROVEMENT AND ERP IMPLEMENTATION ENHANCEMENTS IN THE PREVENTIVE MAINTENANCE SECTION A CASE STUDY IN IRAN [32.1, 1.2, 2016, Pages 131-139]
-
Akbari Jokar, M.R.
LOCATION AND ALLOCATION OF PASSENGER PORTS IN MAZANDARAN PROVINCE WITH COMBINATION OF SET COVERING METHOD AND THE FUZZY TOPSIS METHOD [32.1, 1.1, 2016, Pages 21-30]
-
Akhondzade Noghabi, E.
A NEW APPROACH OF USING DATA MINING TOOLS FOR REDUCING COSTS OF QUALITY IN MEASURING CHEMICAL PARAMETERS [32.1, 1.2, 2016, Pages 13-21]
-
Albadvi, A.
SUPPLY CHAIN CONFIGURATION DESIGN (CASE STUDY IN PRODUCTION COMPANY) [32.1, 2.2, 2017, Pages 15-25]
-
Alinaghian, M.
A NEW INTEGRATED MODEL OF DYNAMIC CELLULAR MANUFACTURING AND SUPPLY CHAIN SYSTEM WITH CONSIDERATION OF WAREHOUSE LOCATION [32.1, 2.1, 2017, Pages 47-58]
-
Alinezhad, A.
SUPPLIER SELECTION BY COMBINATION OF AHP METHOD AND ROUGH SETS THEORY AND PRESENTING A MODEL FOR ORDER ALLOCATION TO SELECTED SUPPLIERS [32.1, 1.1, 2016, Pages 89-98]
-
Alizadeh, S.
PROVIDE A MODEL FOR ANALYZING CUSTOMER BEHAVIOR USING DATA MINING THE ANALYSIS OF EDIBLE OIL INDUSTRY [32.1, 1.2, 2016, Pages 81-86]
-
Ameri Rad Gheysari, B.
PRIORITIZATION & SELECTION OF PROJECTS BASED ON LINGUISTIC FINANCIAL CRITERIA BY FUZZY MOORA & DEVELOPED WEIGHTED ENTROPY [32.1, 1.2, 2016, Pages 87-96]
-
Amidi Golpayegani, O.
NEW APPROACH IN FUZZY GAME THEORY FOR EVALUATING OPTIMAL DECISION IN MULTI-CRITERIA DECISION MAKING PROBLEM [32.1, 1.2, 2016, Pages 109-116]
-
Amini, A.
SUPPLIER SELECTION BY COMBINATION OF AHP METHOD AND ROUGH SETS THEORY AND PRESENTING A MODEL FOR ORDER ALLOCATION TO SELECTED SUPPLIERS [32.1, 1.1, 2016, Pages 89-98]
-
Amiri, A.
DEVELOPING VSI lEWMA _3 CONTROL CHART FOR MONITORING SIMPLE LINEAR PROFILES [32.1, 1.2, 2016, Pages 23-33]
-
Amiri, A.
INTERVAL ESTIMATION OF ${bf C_{pm}}$ AND ${bf C_{pmk}}$ IN AR(1) PROCESS USING CIRCULAR BLOCK BOOTSTRAP METHOD [32.1, 2.2, 2017, Pages 89-98]
-
Anvary Rostamy, A.A.
COMPANY PERFORMANCE EVALUATION USING FINANCIAL RATIOS: AN APPLICATION OF
BOOTSTRAPPED DATA ENVELOPMENT ANALYSIS APPROACH [32.1, 2.1, 2017, Pages 101-109]
-
Asl Hadad, A.
LINEAR PROGRAMMING MODELS FOR LATEST OCCURRENCE TIMES IN PROJECT NETWORKS WITH IMPRECISE DURATIONS [32.1, 1.2, 2016, Pages 3-11]
-
Asrzad, A.
A GENETIC ALGORITHM FOR RESOURCE RENTING PROBLEM WITH DISCOUNTED CASH FLOW [32.1, 1.1, 2016, Pages 31-39]
-
Azadeh, M. A.
NEW APPROACH IN FUZZY GAME THEORY FOR EVALUATING OPTIMAL DECISION IN MULTI-CRITERIA DECISION MAKING PROBLEM [32.1, 1.2, 2016, Pages 109-116]
-
Azar, A.
COMPANY PERFORMANCE EVALUATION USING FINANCIAL RATIOS: AN APPLICATION OF
BOOTSTRAPPED DATA ENVELOPMENT ANALYSIS APPROACH [32.1, 2.1, 2017, Pages 101-109]
B
-
Badri, H.
LOCATION AND ALLOCATION OF PASSENGER PORTS IN MAZANDARAN PROVINCE WITH COMBINATION OF SET COVERING METHOD AND THE FUZZY TOPSIS METHOD [32.1, 1.1, 2016, Pages 21-30]
-
Bagheri, M.
PROJECT RESOURCE LEVELING WITH AN EFFICIENT SIMULATED ANNEALING ALGORITHM [32.1, 2.2, 2017, Pages 35-45]
-
Bashiri, M.
MODELING AND SOLVING THE DYNAMIC GRADUAL COVERING LOCATION PROBLEM [32.1, 2.1, 2017, Pages 11-24]
-
Bozorgi-Amiri, A.
A NEW INTEGRATED MODEL OF DYNAMIC CELLULAR MANUFACTURING AND SUPPLY CHAIN SYSTEM WITH CONSIDERATION OF WAREHOUSE LOCATION [32.1, 2.1, 2017, Pages 47-58]
C
-
Chaichi, N.
DEVELOPING VSI lEWMA _3 CONTROL CHART FOR MONITORING SIMPLE LINEAR PROFILES [32.1, 1.2, 2016, Pages 23-33]
-
Cheragh, G.
RELIABILITY AND COST OPTIMIZATION OF A SERIES-PARALLEL SYSTEM WITH K-OUT-OF-N
SUB-SYSTEMS WITH CONSIDERING DEPENDENT COMPONENTS FAILURE RATE [32.1, 1.2, 2016, Pages 141-148]
-
Cheraghi, Z.
PRICING AND ADVERTISING DECISIONS COORDINATION USING GAME THEORY [32.1, 1.1, 2016, Pages 65-78]
-
Cheraghi, Z.
STOCHASTIC PRICING AND COOPERATIVE ADVERTISING MODEL WITH MARKET NOISE EFFECT [32.1, 2.2, 2017, Pages 77-87]
D
-
Danaeefard, H.
FRAMEWORK OF MULTI-LEVEL SUCCESS AT PUBLIC -PRIVATE PARTNERSHIP PROJECTS [32.1, 1.1, 2016, Pages 127-138]
-
Daneshjafari, D.
FRAMEWORK OF MULTI-LEVEL SUCCESS AT PUBLIC -PRIVATE PARTNERSHIP PROJECTS [32.1, 1.1, 2016, Pages 127-138]
-
Daneshmandi, M.
A NEW APPROACH OF USING DATA MINING TOOLS FOR REDUCING COSTS OF QUALITY IN MEASURING CHEMICAL PARAMETERS [32.1, 1.2, 2016, Pages 13-21]
-
Dashti Maljaii, K.
RELIABILITY AND COST OPTIMIZATION OF A SERIES-PARALLEL SYSTEM WITH K-OUT-OF-N
SUB-SYSTEMS WITH CONSIDERING DEPENDENT COMPONENTS FAILURE RATE [32.1, 1.2, 2016, Pages 141-148]
E
-
Eghbali babadi, A.
CONTRACTOR SELECTION MODEL USING THE COMBINATION OF ANP AND A HEURISTIC METHOD (CASE STUDY: MANUFACTURING PROJECTS [32.1, 2.2, 2017, Pages 131-138]
-
Ehsan, A.
TWO-STAGE STOCHASTIC PROGRAMMING MODEL FOR LOCATION OF COLLECTION CENTERS IN GREEN LOGISTICS NETWORKS [32.1, 1.2, 2016, Pages 57-65]
-
Eshghi, K.
GROUP DECISION MAKING WITH HETEROGENEOUS INCOMPLETE UNCERTAIN PREFERENCE
RELATION [32.1, 2.2, 2017, Pages 99-111]
-
Esmaeilian, Gh.
IDENTIFICATION, QUALITATIVE ANALYSIS, RANKING, AND CLUSTERING OF RISKS OF OVERHEAD POWER LINES PROJECTS BASED ON PMBOK STANDARD [32.1, 2.1, 2017, Pages 35-46]
-
Eydi, A.
TWO METAHEURISTIC APPROACHES FOR DISCRETE TIME-COST-QUALITY TRADEOFF PROBLEM WITH GENERALIZED PRECEDENCE CONSTRAINTS [32.1, 1.2, 2016, Pages 35-46]
F
-
Fallahian-Najafabadi, A.
PROPOSING AND OPTIMIZING A MULTI-OBJECTIVE MATHEMATICAL MODEL FOR CROSS DOCKING PROBLEM USING META-HEURISTIC ALGORITHMS [32.1, 1.2, 2016, Pages 67-79]
-
Farokhi, S.
PROPOSING AND OPTIMIZING A MULTI-OBJECTIVE MATHEMATICAL MODEL FOR CROSS DOCKING PROBLEM USING META-HEURISTIC ALGORITHMS [32.1, 1.2, 2016, Pages 67-79]
-
Farughi, H.
TWO METAHEURISTIC APPROACHES FOR DISCRETE TIME-COST-QUALITY TRADEOFF PROBLEM WITH GENERALIZED PRECEDENCE CONSTRAINTS [32.1, 1.2, 2016, Pages 35-46]
-
Fattahi, P.
A MODEL AND CONSTRUCTIVE HEURISTIC APPROACH FOR MULTI-PRODUCT MULTI-PERIOD INVENTORY ROUTING PROBLEM WITH BACKLOGGING AND TIME WINDOW [32.1, 1.1, 2016, Pages 99-111]
-
Fattahi, P.
A BI-OBJECTIVE CONGESTED NETWORK LOCATION PROBLEM TO OPTIMIZE RELIABILITY AND COST OF SYSTEM [32.1, 2.2, 2017, Pages 27-33]
G
-
Garmeyi, Y.
MODELING AND SOLVING THE DYNAMIC GRADUAL COVERING LOCATION PROBLEM [32.1, 2.1, 2017, Pages 11-24]
-
Ghezavati, V.R.
TWO-STAGE STOCHASTIC PROGRAMMING MODEL FOR LOCATION OF COLLECTION CENTERS IN GREEN LOGISTICS NETWORKS [32.1, 1.2, 2016, Pages 57-65]
-
Ghodoosie Barati, M.
BUILDING THE HOUSE OF QUALITY IN QFD PROCESS BY UNBALANCED MULTI-GRANULAR DATA [32.1, 2.1, 2017, Pages 141-152]
-
Golara, S.
[32.1, 2.1, 2017, Pages 85-97]
-
Golchin, S.
MODELING AND SCHEDULING HYBRID FLOWSHOP WITH BATCH PROCESSING MACHINES [32.1, 1.1, 2016, Pages 79-87]
H
-
Hajipour, V.
A BI-OBJECTIVE CONGESTED NETWORK LOCATION PROBLEM TO OPTIMIZE RELIABILITY AND COST OF SYSTEM [32.1, 2.2, 2017, Pages 27-33]
-
Hamedi, M.
IDENTIFICATION, QUALITATIVE ANALYSIS, RANKING, AND CLUSTERING OF RISKS OF OVERHEAD POWER LINES PROJECTS BASED ON PMBOK STANDARD [32.1, 2.1, 2017, Pages 35-46]
-
Hamid Mirmohammadi, S.
AN EFFICIENT APPROACH FOR DETERMINATION OF THE ORDERING POLICY IN A MULTI-ITEM CONTINUOUS REVIEW INVENTORY SYSTEM WITH STOCHASTIC DEMAND AND BUDGET [32.1, 2.1, 2017, Pages 25-33]
-
Hesameddin Anvar, S.
INTEGRATED TRANSPORTATION AND INVENTORY PLANNING IN A SUPPLY CHAIN WITH CARBON
EMISSION CONSIDERATION [32.1, 2.1, 2017, Pages 59-69]
-
Hojjati, S.M.H.
OPTIMIZING WIP CONSIDERING UNBALANCED MACHINE CAPACITY AND EMERGENCY MAINTENANCE IN FLOW SHOP SYSTEMS [32.1, 2.1, 2017, Pages 119-126]
-
Hosseini, M.
CUSTOMER MIGRATION MANAGEMENT USING CUSTOMER DATA IN TELECOM INDUSTRY [32.1, 1.1, 2016, Pages 147-154]
-
Hossien Zadeh Kashan, A.
SUPPLY CHAIN CONFIGURATION DESIGN (CASE STUDY IN PRODUCTION COMPANY) [32.1, 2.2, 2017, Pages 15-25]
I
-
Isvand, F.
CUSTOMER MIGRATION MANAGEMENT USING CUSTOMER DATA IN TELECOM INDUSTRY [32.1, 1.1, 2016, Pages 147-154]
J
-
Jafarian Namin, S.
INTERVAL ESTIMATION OF ${bf C_{pm}}$ AND ${bf C_{pmk}}$ IN AR(1) PROCESS USING CIRCULAR BLOCK BOOTSTRAP METHOD [32.1, 2.2, 2017, Pages 89-98]
-
Jamali, A.
PREDICTING THE JOB PERFORMANCE BY USING MULTI-OBJECTIVE OPTIMIZATION AND GMDH-TYPE NEURAL NETWORK TO IMPROVE PERSONNEL SELECTION PROCESS [32.1, 1.1, 2016, Pages 41-51]
-
Jolai, F.
PROJECT RESOURCE LEVELING WITH AN EFFICIENT SIMULATED ANNEALING ALGORITHM [32.1, 2.2, 2017, Pages 35-45]
K
-
Kakaie, A.
[32.1, 2.2, 2017, Pages 113-120]
-
Kalate Rahmani, R.
COMPANY PERFORMANCE EVALUATION USING FINANCIAL RATIOS: AN APPLICATION OF
BOOTSTRAPPED DATA ENVELOPMENT ANALYSIS APPROACH [32.1, 2.1, 2017, Pages 101-109]
-
Karbasian, M.
CONTRACTOR SELECTION MODEL USING THE COMBINATION OF ANP AND A HEURISTIC METHOD (CASE STUDY: MANUFACTURING PROJECTS [32.1, 2.2, 2017, Pages 131-138]
-
Kardan, E.
OPTIMIZING WIP CONSIDERING UNBALANCED MACHINE CAPACITY AND EMERGENCY MAINTENANCE IN FLOW SHOP SYSTEMS [32.1, 2.1, 2017, Pages 119-126]
-
Kashtiban, Y.
FRAMEWORK OF MULTI-LEVEL SUCCESS AT PUBLIC -PRIVATE PARTNERSHIP PROJECTS [32.1, 1.1, 2016, Pages 127-138]
-
Kazemi, A.
SUPPLIER SELECTION BY COMBINATION OF AHP METHOD AND ROUGH SETS THEORY AND PRESENTING A MODEL FOR ORDER ALLOCATION TO SELECTED SUPPLIERS [32.1, 1.1, 2016, Pages 89-98]
-
Kazemi, A.
PRESENTING A MULTI OBJECTIVE MODEL FOR SUPPLIER SELECTION WITH CONSIDERING DISCOUNT, DELAY PAYMENT AND MINIMUM DISTANCE [32.1, 2.2, 2017, Pages 47-56]
-
Kazemi, M.
A NEW INTEGRATED MODEL OF DYNAMIC CELLULAR MANUFACTURING AND SUPPLY CHAIN SYSTEM WITH CONSIDERATION OF WAREHOUSE LOCATION [32.1, 2.1, 2017, Pages 47-58]
-
Keshavarzi, A.
A TWO-ECHELON SINGLE-PERIOD INVENTORY CONTROL PROBLEM UNDER A BUDGET CONSTRAINT AND DISCOUNT CONDITIONS WITH PARTICLE SWARM ALGORITHM [32.1, 1.1, 2016, Pages 3-12]
-
Khodaverdi, M.
MULTI-BOUND ROBUST MODEL OF FACILITY LOCATION PROBLEM TO DEAL WITH HISTOGRAM-BASE UNCERTAINTY [32.1, 2.1, 2017, Pages 111-117]
-
Kordestani, M.
MONITORING MULTIVARIATE SIMPLE LINEAR PROFILES USING ROBUST REGRESSION M-ESTIMATORS [32.1, 2.2, 2017, Pages 3-13]
M
-
Mahrough, L.
BUILDING THE HOUSE OF QUALITY IN QFD PROCESS BY UNBALANCED MULTI-GRANULAR DATA [32.1, 2.1, 2017, Pages 141-152]
-
Mahtabi, M.
A CLUSTERING ALGORITHM FOR DETECTION OF MULTIPLE CHANGE-POINTS IN MONITORING SIMPLE LINEAR PROFILES [32.1, 1.2, 2016, Pages 47-55]
-
Minaei-Bidgoli, B.
A NEW APPROACH OF USING DATA MINING TOOLS FOR REDUCING COSTS OF QUALITY IN MEASURING CHEMICAL PARAMETERS [32.1, 1.2, 2016, Pages 13-21]
-
MirFakhradini, S.H.
IMPROVING THE QUALITY OF BANKING SERVICES: PROVIDE AN INTEGRATED METHODOLOGY FOR THE KANO MODEL AND PERFORMANCE CONTROL MATRIX (PCM) (THE STUDY OF: SADERAT [32.1, 1.1, 2016, Pages 13-20]
-
Mirfendereski, A.
GROUP DECISION MAKING WITH HETEROGENEOUS INCOMPLETE UNCERTAIN PREFERENCE
RELATION [32.1, 2.2, 2017, Pages 99-111]
-
Moazzam Jazi, Z.
IDENTIFICATION, QUALITATIVE ANALYSIS, RANKING, AND CLUSTERING OF RISKS OF OVERHEAD POWER LINES PROJECTS BASED ON PMBOK STANDARD [32.1, 2.1, 2017, Pages 35-46]
-
Moeinipour, M.
LINEAR PROGRAMMING MODELS FOR LATEST OCCURRENCE TIMES IN PROJECT NETWORKS WITH IMPRECISE DURATIONS [32.1, 1.2, 2016, Pages 3-11]
-
Mohammadkhan, A.
THE COMPARATIVE COLLABORATION STRATEGIES IN THE SUPPLY CHAIN OF AUTOMOTIVE PARTS MANUFACTURER- USING SIMULATIONS [32.1, 2.1, 2017, Pages 71-84]
-
Mohtashami, A.
PROPOSING AND OPTIMIZING A MULTI-OBJECTIVE MATHEMATICAL MODEL FOR CROSS DOCKING PROBLEM USING META-HEURISTIC ALGORITHMS [32.1, 1.2, 2016, Pages 67-79]
-
Montazer, G. A.
SELECTING PARTNER IN THE AIRLINE INDUSTRY USING COMBINATION OF FANP AND FCOPRAS
METHODS [32.1, 1.2, 2016, Pages 117-129]
-
Moradi, M.
PREDICTING THE JOB PERFORMANCE BY USING MULTI-OBJECTIVE OPTIMIZATION AND GMDH-TYPE NEURAL NETWORK TO IMPROVE PERSONNEL SELECTION PROCESS [32.1, 1.1, 2016, Pages 41-51]
-
Moradigorji, M.
THE ROLE OF ERP IN THE ENTERPRISE PROCESS IMPROVEMENT AND ERP IMPLEMENTATION ENHANCEMENTS IN THE PREVENTIVE MAINTENANCE SECTION A CASE STUDY IN IRAN [32.1, 1.2, 2016, Pages 131-139]
-
Morovatdar, R.
LINEAR PROGRAMMING MODELS FOR LATEST OCCURRENCE TIMES IN PROJECT NETWORKS WITH IMPRECISE DURATIONS [32.1, 1.2, 2016, Pages 3-11]
-
Mostafavi, S.M.
SUPPLY CHAIN CONFIGURATION DESIGN (CASE STUDY IN PRODUCTION COMPANY) [32.1, 2.2, 2017, Pages 15-25]
N
-
Naderi, B.
MODELING AND SCHEDULING HYBRID FLOWSHOP WITH BATCH PROCESSING MACHINES [32.1, 1.1, 2016, Pages 79-87]
-
Niknamfar, A.H.
MULTI-OBJECTIVE PRODUCTION-DISTRIBUTION PLANNING BASED ON VENDOR MANAGED INVENTORY [32.1, 1.1, 2016, Pages 53-63]
-
Nourianfar, K.
SELECTING PARTNER IN THE AIRLINE INDUSTRY USING COMBINATION OF FANP AND FCOPRAS
METHODS [32.1, 1.2, 2016, Pages 117-129]
O
-
Omidvari, M.
SUBMITTING A PATTERN FOR THE EVALUATION OF PERFORMANCE OF THERAPEUTIC CENTERS
WITH JOB BY BSC AND COMBINING IT WITH THE FANP METHOD (CASE STUDY: IMAM SAJJAD [32.1, 1.1, 2016, Pages 139-146]
P
-
Parand, H.
A MODEL AND CONSTRUCTIVE HEURISTIC APPROACH FOR MULTI-PRODUCT MULTI-PERIOD INVENTORY ROUTING PROBLEM WITH BACKLOGGING AND TIME WINDOW [32.1, 1.1, 2016, Pages 99-111]
-
Pasandide, S.H.
A TWO-ECHELON SINGLE-PERIOD INVENTORY CONTROL PROBLEM UNDER A BUDGET CONSTRAINT AND DISCOUNT CONDITIONS WITH PARTICLE SWARM ALGORITHM [32.1, 1.1, 2016, Pages 3-12]
-
Pasandideh, S.H.
MULTI-OBJECTIVE PRODUCTION-DISTRIBUTION PLANNING BASED ON VENDOR MANAGED INVENTORY [32.1, 1.1, 2016, Pages 53-63]
-
Peirow, S.
IMPROVING THE QUALITY OF BANKING SERVICES: PROVIDE AN INTEGRATED METHODOLOGY FOR THE KANO MODEL AND PERFORMANCE CONTROL MATRIX (PCM) (THE STUDY OF: SADERAT [32.1, 1.1, 2016, Pages 13-20]
R
-
Rabbani, M.
SELECTING THE EFFECTIVE FACTORS ON THE HIERARCHY OF MANUFACTURING OUTPUTS FROM MODIFIED SCOR METRICS [32.1, 1.1, 2016, Pages 113-125]
-
Rahimi, F.
[32.1, 2.2, 2017, Pages 113-120]
-
Raissi, S.
INTERVAL ESTIMATION OF ${bf C_{pm}}$ AND ${bf C_{pmk}}$ IN AR(1) PROCESS USING CIRCULAR BLOCK BOOTSTRAP METHOD [32.1, 2.2, 2017, Pages 89-98]
-
Razmi, J.
COMPARISON OF NEURAL NETWORK MODELS IN THE CREDIT RATING OF THE BANKING SYSTEM AND PROVIDING THE BEST (OPTIMAL)MODEL [32.1, 2.1, 2017, Pages 127-140]
-
Razmi, J.
ANALYSIS THE EFFECT OF MAIN CREDIT RISK VARIABLES ON DECISION OPTIMIZATION IN CREDIT PORTFOLIO (CASE STUDY: AYANDEH OF BANK BRANCHES) [32.1, 2.2, 2017, Pages 65-76]
-
Roghanian, E.
LINEAR PROGRAMMING MODELS FOR LATEST OCCURRENCE TIMES IN PROJECT NETWORKS WITH IMPRECISE DURATIONS [32.1, 1.2, 2016, Pages 3-11]
S
-
Sadegheih, A.
INTEGRATED TRANSPORTATION AND INVENTORY PLANNING IN A SUPPLY CHAIN WITH CARBON
EMISSION CONSIDERATION [32.1, 2.1, 2017, Pages 59-69]
-
Sadeghi Rad, R.
AN EFFICIENT APPROACH FOR DETERMINATION OF THE ORDERING POLICY IN A MULTI-ITEM CONTINUOUS REVIEW INVENTORY SYSTEM WITH STOCHASTIC DEMAND AND BUDGET [32.1, 2.1, 2017, Pages 25-33]
-
Saleh Owlia, M.
OPTIMIZATION OF SERVICE QUALITY USING HYBRID SERVQUAL, QFD AND GOAL PROGRAMMING [32.1, 2.2, 2017, Pages 57-63]
-
Samimi, Y.
A CLUSTERING ALGORITHM FOR DETECTION OF MULTIPLE CHANGE-POINTS IN MONITORING SIMPLE LINEAR PROFILES [32.1, 1.2, 2016, Pages 47-55]
-
Samimi, Y.
MONITORING MULTIVARIATE SIMPLE LINEAR PROFILES USING ROBUST REGRESSION M-ESTIMATORS [32.1, 2.2, 2017, Pages 3-13]
-
Sayani, N.
OPTIMIZATION OF SERVICE QUALITY USING HYBRID SERVQUAL, QFD AND GOAL PROGRAMMING [32.1, 2.2, 2017, Pages 57-63]
-
Sepehri, M.
A GENETIC ALGORITHM FOR RESOURCE RENTING PROBLEM WITH DISCOUNTED CASH FLOW [32.1, 1.1, 2016, Pages 31-39]
-
Seyedhosseini, S. M.
SELECTING THE EFFECTIVE FACTORS ON THE HIERARCHY OF MANUFACTURING OUTPUTS FROM MODIFIED SCOR METRICS [32.1, 1.1, 2016, Pages 113-125]
-
Shabanzadeh Gavasarai, M.
PROVIDE A MODEL FOR ANALYZING CUSTOMER BEHAVIOR USING DATA MINING THE ANALYSIS OF EDIBLE OIL INDUSTRY [32.1, 1.2, 2016, Pages 81-86]
-
Shadrokh, Sh.
A GENETIC ALGORITHM FOR RESOURCE RENTING PROBLEM WITH DISCOUNTED CASH FLOW [32.1, 1.1, 2016, Pages 31-39]
-
Shafaei, R.
SOLVING ROUTING PROBLEM WITH HETEROGENEOUS FLEET BY MULTI-OBJECTIVE PARTICLE SWARM OPTIMIZATION [32.1, 2.1, 2017, Pages 3-10]
-
Shafiee Gol, Sh.
A NEW INTEGRATED MODEL OF DYNAMIC CELLULAR MANUFACTURING AND SUPPLY CHAIN SYSTEM WITH CONSIDERATION OF WAREHOUSE LOCATION [32.1, 2.1, 2017, Pages 47-58]
-
Shahbazi, M.
COMPARISON OF NEURAL NETWORK MODELS IN THE CREDIT RATING OF THE BANKING SYSTEM AND PROVIDING THE BEST (OPTIMAL)MODEL [32.1, 2.1, 2017, Pages 127-140]
-
Shahbazi, M.
ANALYSIS THE EFFECT OF MAIN CREDIT RISK VARIABLES ON DECISION OPTIMIZATION IN CREDIT PORTFOLIO (CASE STUDY: AYANDEH OF BANK BRANCHES) [32.1, 2.2, 2017, Pages 65-76]
-
Sharifi, M.
MODELING AND SCHEDULING HYBRID FLOWSHOP WITH BATCH PROCESSING MACHINES [32.1, 1.1, 2016, Pages 79-87]
-
Sharifi, M.
RELIABILITY AND COST OPTIMIZATION OF A SERIES-PARALLEL SYSTEM WITH K-OUT-OF-N
SUB-SYSTEMS WITH CONSIDERING DEPENDENT COMPONENTS FAILURE RATE [32.1, 1.2, 2016, Pages 141-148]
-
Sheikh, R.
PRIORITIZATION & SELECTION OF PROJECTS BASED ON LINGUISTIC FINANCIAL CRITERIA BY FUZZY MOORA & DEVELOPED WEIGHTED ENTROPY [32.1, 1.2, 2016, Pages 87-96]
-
Sobhiyah, M.H.
FRAMEWORK OF MULTI-LEVEL SUCCESS AT PUBLIC -PRIVATE PARTNERSHIP PROJECTS [32.1, 1.1, 2016, Pages 127-138]
T
-
Tahanian-Qomi, S.M.
STOCHASTIC BI-OBJECTIVE INVENTORY CONTROL WITH MULTI-MODE TRANSPORTATION AND THE USE OF A BIN PACKING PROBLEM [32.1, 1.2, 2016, Pages 97-107]
-
Talebi, S.
LOCATION AND ALLOCATION OF PASSENGER PORTS IN MAZANDARAN PROVINCE WITH COMBINATION OF SET COVERING METHOD AND THE FUZZY TOPSIS METHOD [32.1, 1.1, 2016, Pages 21-30]
-
Taleizadeh, A.
PRICING AND ADVERTISING DECISIONS COORDINATION USING GAME THEORY [32.1, 1.1, 2016, Pages 65-78]
-
Taleizadeh, A.
STOCHASTIC PRICING AND COOPERATIVE ADVERTISING MODEL WITH MARKET NOISE EFFECT [32.1, 2.2, 2017, Pages 77-87]
-
Tavakkoli-Moghaddam, R.
TWO-STAGE STOCHASTIC PROGRAMMING MODEL FOR LOCATION OF COLLECTION CENTERS IN GREEN LOGISTICS NETWORKS [32.1, 1.2, 2016, Pages 57-65]
-
Tavakkoli-Moghaddam, R.
STOCHASTIC BI-OBJECTIVE INVENTORY CONTROL WITH MULTI-MODE TRANSPORTATION AND THE USE OF A BIN PACKING PROBLEM [32.1, 1.2, 2016, Pages 97-107]
-
Torabi, S. A.
INTEGRATED TRANSPORTATION AND INVENTORY PLANNING IN A SUPPLY CHAIN WITH CARBON
EMISSION CONSIDERATION [32.1, 2.1, 2017, Pages 59-69]
V
-
Vahdat Zad, M. A.
INTEGRATED TRANSPORTATION AND INVENTORY PLANNING IN A SUPPLY CHAIN WITH CARBON
EMISSION CONSIDERATION [32.1, 2.1, 2017, Pages 59-69]
Y
-
Yari gholi, H.
PRESENTING A MULTI OBJECTIVE MODEL FOR SUPPLIER SELECTION WITH CONSIDERING DISCOUNT, DELAY PAYMENT AND MINIMUM DISTANCE [32.1, 2.2, 2017, Pages 47-56]
Z
-
Zakery, A.
A MODEL FOR MEASURING THE GAP IN ORGANIZATIONAL RESOURCES INVESTMENT, EMPIRICAL STUDY IN IRAN AUTOMOTIVE INDUSTRY [32.1, 2.2, 2017, Pages 121-130]
-
Zanjani, B.
PREDICTING THE JOB PERFORMANCE BY USING MULTI-OBJECTIVE OPTIMIZATION AND GMDH-TYPE NEURAL NETWORK TO IMPROVE PERSONNEL SELECTION PROCESS [32.1, 1.1, 2016, Pages 41-51]
-
Zare Mehrjerdi, Y.
THE COMPARATIVE COLLABORATION STRATEGIES IN THE SUPPLY CHAIN OF AUTOMOTIVE PARTS MANUFACTURER- USING SIMULATIONS [32.1, 2.1, 2017, Pages 71-84]
-
Zegordi, S.H.
[32.1, 2.1, 2017, Pages 85-97]
Your query does not match with any item