A
-
Agility
A MODEL FOR AGILITY DEVELOPMENT IN ORGANIZATIONS [Volume 26, Issue 2, 2010, Pages 127-138]
-
Analytic Hierarchy Process (AHP)
ROBUST MODELS FOR INTERVAL COMPARISON MATRIX IN AHP [Volume 26, Issue 1, 2010, Pages 65-81]
-
AntNet algorithm
SOLVING THE DYNAMIC VEHICLE ROUTING PROBLEM WITH ANTNET ALGORITHM [Volume 26, Issue 2, 2010, Pages 65-70]
B
-
Barrier to change
PRESENTING A MODEL ON THE RESISTANCE TO CHANGE, BASED ON THEORY OF CONSTRAINTS:
A CASE STUDY OF ESFAHAN STEEL COMPANY (ESCO) [Volume 26, Issue 1, 2010, Pages 27-37]
C
-
Customer Satisfaction
A COMPARISON OF CUSTOMER SATISFACTION CONSTRUCT WITH PERCEIVED OVERALL QUALITY: AN APPLICATION OF THE GREY SYSTEM THEORY [Volume 26, Issue 2, 2010, Pages 3-8]
D
-
Data envelopment analysis (DEA)
DEVELOPMENT OF AN ALGORITHM FOR THE STABILITY REGION BY CHANGING THE REFERENCE SET IN DEA [Volume 26, Issue 2, 2010, Pages 59-64]
-
Dynamic programming
OPTIMIZATION OF THE THRESHOLD FOR PREVENTIVE MAINTENANCE ACTIONS IN A CONDITION-BASED MAINTENANCE PROGRAM USING A DYNAMIC PROGRAMMING APPROACH [Volume 26, Issue 2, 2010, Pages 115-119]
E
-
Economic order quantity
AN EOQ MODEL FOR DETERIORATING ITEMS: GENETIC ALGORITHM APPROACH [Volume 26, Issue 1, 2010, Pages 83-90]
-
Enterprise Resource planning (ERP)
PRESENTING A MODEL ON THE RESISTANCE TO CHANGE, BASED ON THEORY OF CONSTRAINTS:
A CASE STUDY OF ESFAHAN STEEL COMPANY (ESCO) [Volume 26, Issue 1, 2010, Pages 27-37]
-
EPC project
EVALUATING SUCCESS FACTORS IN EPC PROJECTS: CASE STUDY; MAPNA POWER PLANT PROJECTS [Volume 26, Issue 2, 2010, Pages 23-33]
F
-
Factor Analysis
A MODEL FOR AGILITY DEVELOPMENT IN ORGANIZATIONS [Volume 26, Issue 2, 2010, Pages 127-138]
-
Flexible job shop scheduling
FLEXIBLE JOB SHOP SCHEDULING PROBLEM; CONSIDERING MAINTENANCE CONSTRAINT [Volume 26, Issue 1, 2010, Pages 101-115]
G
-
Genetic Algorithm
MINIMIZATION FLOW TIME IN FLEXIBLE DYNAMIC JOB SHOP SCHEDULING PROBLEM WITH PARALLEL MACHINES [Volume 26, Issue 2, 2010, Pages 47-58]
-
GIS
PREVENTIVE MAINTENANCE AND REPAIR SYSTEM USING GIS [Volume 26, Issue 2, 2010, Pages 121-126]
-
GMPS
PREVENTIVE MAINTENANCE AND REPAIR SYSTEM USING GIS [Volume 26, Issue 2, 2010, Pages 121-126]
I
-
ICT infrastructure and access
DESIGNING A NEW MODEL FOR ASSESSING COUNTRIES ICT INFRASTRUCTURE READINESS [Volume 26, Issue 1, 2010, Pages 39-51]
-
Interval Comparison Matrix
ROBUST MODELS FOR INTERVAL COMPARISON MATRIX IN AHP [Volume 26, Issue 1, 2010, Pages 65-81]
-
Inventory control
AN EOQ MODEL FOR DETERIORATING ITEMS: GENETIC ALGORITHM APPROACH [Volume 26, Issue 1, 2010, Pages 83-90]
-
IT firms
A MODEL FOR CRM MATURITY ASSESSMENT (CASE STUDY: IRANIAN IT FIRM) [Volume 26, Issue 1, 2010, Pages 117-124]
M
-
Machine Availability
FLEXIBLE JOB SHOP SCHEDULING PROBLEM; CONSIDERING MAINTENANCE CONSTRAINT [Volume 26, Issue 1, 2010, Pages 101-115]
-
MAPNA Group
EVALUATING SUCCESS FACTORS IN EPC PROJECTS: CASE STUDY; MAPNA POWER PLANT PROJECTS [Volume 26, Issue 2, 2010, Pages 23-33]
-
Markov Chain Monte Carlo (MCMC)
DESIGNING A NEW MODEL FOR ASSESSING COUNTRIES ICT INFRASTRUCTURE READINESS [Volume 26, Issue 1, 2010, Pages 39-51]
-
Mathematical modeling
A MATHEMATICAL MODEL AND SOLUTION METHOD TO ENHANCE THE URBAN WASTE COLLECTION PROCESS IN TEHRAN [Volume 26, Issue 2, 2010, Pages 99-106]
O
-
Organizational change
PRESENTING A MODEL ON THE RESISTANCE TO CHANGE, BASED ON THEORY OF CONSTRAINTS:
A CASE STUDY OF ESFAHAN STEEL COMPANY (ESCO) [Volume 26, Issue 1, 2010, Pages 27-37]
P
-
Project management
PRESENTING A MODEL ON THE RESISTANCE TO CHANGE, BASED ON THEORY OF CONSTRAINTS:
A CASE STUDY OF ESFAHAN STEEL COMPANY (ESCO) [Volume 26, Issue 1, 2010, Pages 27-37]
Q
-
Qualitative Case Study Research
PRESENTING A MODEL ON THE RESISTANCE TO CHANGE, BASED ON THEORY OF CONSTRAINTS:
A CASE STUDY OF ESFAHAN STEEL COMPANY (ESCO) [Volume 26, Issue 1, 2010, Pages 27-37]
R
-
Reliability
OPTIMIZATION OF THE THRESHOLD FOR PREVENTIVE MAINTENANCE ACTIONS IN A CONDITION-BASED MAINTENANCE PROGRAM USING A DYNAMIC PROGRAMMING APPROACH [Volume 26, Issue 2, 2010, Pages 115-119]
-
Resistance to change
PRESENTING A MODEL ON THE RESISTANCE TO CHANGE, BASED ON THEORY OF CONSTRAINTS:
A CASE STUDY OF ESFAHAN STEEL COMPANY (ESCO) [Volume 26, Issue 1, 2010, Pages 27-37]
S
-
Simulation
A SYSTEM DYNAMICS MODEL FOR ANALYZING IRAN’S ENERGY-ECONOMY SYSTEM [Volume 26, Issue 2, 2010, Pages 71-87]
-
Supply chain
A MULTI-ITEM VENDOR-MANAGED INVENTORY WITH JOINT ORDERING CONSTRAINT [Volume 26, Issue 2, 2010, Pages 9-14]
W
-
Waste management
A MATHEMATICAL MODEL AND SOLUTION METHOD TO ENHANCE THE URBAN WASTE COLLECTION PROCESS IN TEHRAN [Volume 26, Issue 2, 2010, Pages 99-106]
Your query does not match with any item